Showing posts with label curbing bag. Show all posts
Showing posts with label curbing bag. Show all posts

May 7, 2008

Almost Done with PSC!

All the pieces of the Printed Silk Cardigan are joined together, the one remaining step is to knit the neckband. I've already picked up the stitches, and with any luck the spacing will be just right. How is it that while picking up stitches, I can end up two short of the mark, redo and still be 2 short, redo and then be 2 stitches too many? And why is one side of the neckline easier to do than the other. After all, both sides of the front have the same number of stitches. If you hear wailing and gnashing (hey, maybe it should be "knashing") of teeth, its just me, deciding that I need to redo the spacing on the picked up neck stitches. Oh, and I found some buttons I like. See?




The Curbing Bag was frogged and restarted as a smaller bag, I really went overboard on the number of stitches I cast on the first time. This has been my main travelling project when I'm in the car, and I average about one curbed section per day, so I get to see some progress. I'm knitting from the bottom up, and started by knitting the bottom piece first and then starting the curbing. I used Judy's Magic Cast On to start the bottom, maybeI should've done the increases differently, as the bag bottom somewhat resembles the toe of a sock. No worries though, I've already got some ideas on how to deal with that. Maybe they'll even turn out to be good ideas.

Toe-up socks haven't been completely ignored during all this, they are finally long enough to cover the ball of my foot. It may be awhile before I'm at the point of working heels on 2 at a time magic loop socks though.






Last Saturday ladies from the San Diego North County Coastal Knitters (we have crocheters and spinners as well) got together at W's home for a dye-along. You know, a Kool-Aid party. Wow, we had a great time. W is a terrific hostess, and those with prior experience at yarn dying gladly shared their tips and tricks for making custom colorways. I will definitely be home-dying yarn again. I call my yellow, green, blue colorway Banana Blues, and the red and purple is Strawberry Grape.

I feel kinda bad, I can't remember the name of the blue Kool-Aid mix I used, but that's what gave the blue coloring. So the Banana Blues the yellow/green came from mixing blue with orange drink flavoring, and then was over dyed with mango.



For Strawberry Grape, the deepest red was black cherry, then the brighter strawberry and the purple coloring was grape flavor. Gosh, the grape was so dark when wet it looked nearly black, so at Wendy's suggestion I added some blue. I really like the combination.



This was so much fun, playing with the colors and seeing how things turned out, I know I have more home dyed yarn in my future. Oh wait, I said that already. :-D

April 26, 2008

quickie!

So, even a short update must be better than none, eh? Still working on the PSC; sleeve cap shaping, finally! I didn't like the way my decreases looked, and so frogged back. Thought about changing the decrease spacing and cap shape, but after much consideration and checking of references decided to continue the pattern as written. I may yet go back and shorten up the armhole depth on the body pieces.

I gotten a few more rounds done on the socks, they might be all of 3" long now. At least that project benefited from my hesitation over what to do with the sleeve shaping and whether I should continue with the Very Large Curbing Bag.

I frogged the Curbing Bag, I really did cast on too many stitches. I'll be starting a smaller version soon, and might try knitting it out from a bottom piece.

April 15, 2008

Impulse

Ok, I think I managed all of 25 minutes of knitting today, all on the curbing bag. I think I'll go to my room now, and knit like a fiend until I fall asleep. That should take all of 12.5 minutes. Its been a busy day.

April 11, 2008

One Week Later....

Really, I was only in Sacramento for the weekend and was back home by Sunday night. That's how busy things have been. I did get a reasonable amount of knitting done on the ride up. The last front piece for the PSC is complete. I packed enough yarn to knit the sleeves at the same time, but didn't even get them cast on. The pattern called for a tubular cast on, and I didn't know how, so the sleeves ended up set aside until Tuesday. The toe up socks got a few more rounds though, at lease until it was too dark to see what I was doing.

Saturday afternoon I started working on a large bag, using ADHD's Curbing Bag pattern. I've been meaning to knit a bag for a while, and thought I'd make a felted one, but liked the idea the with the Curbing Bag, I could use yarns that won't felt - perfect for stash busting fun!

I can't wait to finish the PSC, as I really want to start some quick to knit summer tops. For updates on all the other *stuff* that's been going on, check out my other blog: she rants, she raves.